Joint Commission surveys don't give hospitals much time to correct electrical deficiencies once the surveyors are on site. By the time a finding is documented, the opportunity to prevent it has already passed. The facilities that go through surveys with the fewest findings are the ones that maintain their electrical systems and documentation to the survey standard consistently — not the ones that scramble to catch up when a survey date is announced.
Most Joint Commission electrical findings fall into two categories: documentation deficiencies (testing records that are missing, incomplete, or not current) and physical plant deficiencies (conditions in the electrical infrastructure that don't meet the standards the survey evaluates).
Documentation deficiencies are often the result of testing that was performed but not recorded properly, records that were maintained in a format that doesn't survive an audit, or testing intervals that were allowed to slip. Physical plant deficiencies are often the result of deferred maintenance, construction or renovation work that wasn't completed to the applicable standard, or conditions that developed gradually and weren't identified before a surveyor found them.
Our team can identify both categories of exposure before a survey and help facilities address them. That's more effective than addressing findings after the fact on a corrective action plan timeline.
The Joint Commission's Environment of Care standards — specifically EC.02.05.01 and related elements of performance — establish requirements for utility systems, including electrical systems, emergency power, and fire alarm systems. Electrical-related elements commonly evaluated include:
Our team can review your electrical systems documentation and physical plant and help you address any gaps before the survey.